What we do, end to end
Engineering judgment, on your side of the table.
Each engagement is sized to the question — a one-week feasibility check or a multi-year owner's-rep retainer.
- 01
Concrete Takeoff & Estimation
Detailed concrete quantity takeoffs with marked-up drawings and bid-ready cost estimates. Submitted in your format, on your bid clock
Rate: FROM $40 / HOUR → - 02
Slab Edge & Dimensional Drawings
Slab edge layouts and dimensional control drawings, sheet-by-sheet, coordinated against the structural and architectural sets.
Rate: FROM $200 / SHEET → - 03
Rebar Shop Drawings
Fabrication-ready rebar shop drawings and bar lists. Detailing by engineers who've worked alongside US fabricators.
Rate: FROM $24 / TON → - 04
Support of Excavation Takeoffs
SOE quantities for tieback, soldier-pile, and lagging systems — sequencing and a defensible cost basis the estimator can hand straight to the bid.
Rate: (BY SCOPE) → - 05
Submittal Coordination
End-to-end submittal log management — RFI tracking, approval routing, document control — so your PM stops chasing emails.
Rate: FROM $2,500 / MONTH →
